Dubai-Based Renovation Experts

Kitchen Renovation
in Dubai
Done Right

We handle everything — design, demolition, custom cabinets, tiling, plumbing, electrical, appliance integration, and full fit-out. Based in Al Quoz, we serve all Dubai areas with no subcontracting and no shortcuts.

Service Area All Dubai
Our Base Al Quoz
Response Same Day
Design Included

Kitchen renovation in Dubai is more than replacing cabinet doors. A complete renovation covers design planning, demolition of old units, custom cabinet manufacturing and installation, worktop fitting, splashback tiling, plumbing adjustments, electrical upgrades, appliance integration, and finishing work. At Fixer Guy, we manage every stage in-house from our Al Quoz base, serving homeowners, landlords, and property managers across all Dubai districts.

Full Scope

What We Include in Kitchen Renovation

Every project is handled end-to-end — no partial jobs, no subcontracting without your knowledge.

🎨
Design & Planning

Layout, cabinet configuration, material selection, and visual planning before any physical work begins.

🔨
Demolition & Removal

Safe removal of old kitchen units, worktops, and appliances with proper disposal from site.

🗄️
Custom Cabinets

Made-to-measure base units, wall units, tall units, and island cabinetry in your chosen finish.

🪨
Worktops & Surfaces

Quartz, granite, laminate, and porcelain worktop supply and installation with precise templating.

🔲
Tiling & Splashbacks

Floor and splashback tiling in porcelain, ceramic, or natural stone using leveling systems.

🚿
Plumbing

Sink, dishwasher, and washing machine connections with rerouting where required by layout changes.

⚡
Electrical Work

Cooker points, under-cabinet lighting, socket additions, and extractor fan wiring.

🏠
Appliance Integration

Built-in oven, hob, dishwasher, fridge, and range hood installation with correct ventilation.

📋
Permits Advice

We advise on when permits are needed for kitchen changes and assist with the process.

Is It Time?

Signs You Need a Kitchen Renovation

Kitchens in Dubai face daily heavy use, heat, and humidity. Here are the key signs that a renovation is overdue.

  • ✓ Cabinet doors that do not close properly, are warped, or have swollen from humidity
  • ✓ Worktops with deep scratches, burns, or delaminating edges
  • ✓ Plumbing leaks under the sink or dishwasher area
  • ✓ Insufficient sockets for modern kitchen appliances
  • ✓ Layout that wastes space or makes cooking difficult
  • ✓ Planning to rent, sell, or upgrade your property value
  • ✓ Kitchen more than 8–10 years old without any updates
⚠️ Safety Note

Dubai kitchens with gas cookers require any gas point changes to be carried out by a licensed gas contractor. Electrical cooker point upgrades should also be handled by a qualified electrician. We coordinate the right tradespeople for every aspect of your kitchen renovation.

Before/after kitchen image
How We Work

Our Step-by-Step Renovation Process

Every kitchen renovation follows a structured, transparent process so you always know what is happening and when.

1
WhatsApp Inquiry

You describe your kitchen and requirements. We ask targeted questions to understand scope.

2
Site Visit & Measurement

We visit, measure precisely, check plumbing and electrical positions, and assess structural conditions.

3
Design & Quotation

We prepare a cabinet layout, material options, and a detailed fixed-price quote.

4
Permits (if required)

We advise on any required NOC or building approvals and assist with the application process.

5
Demolition

Old kitchen units and worktops are carefully removed and taken away from site.

6
First Fix (Plumbing & Electrical)

Pipes, drainage, and electrical conduits repositioned before cabinets are installed.

7
Cabinet Installation & Tiling

Custom cabinets installed, worktops templated and fitted, splashbacks and floor tiling completed.

8
Appliances & Handover

Appliances connected and integrated, snagging completed, kitchen handed over clean and fully functional.

Planning Help

Timeline & Cost Overview

Every project is different. These are general guidance ranges to help you plan your kitchen renovation.

⏱️
Timeline

How Long Does It Take?

Kitchen Type Typical Duration
Small Galley (under 8 m²) 2–3 weeks
Standard Kitchen (8–14 m²) 3–4 weeks
Large / Open-Plan (14 m²+) 4–6 weeks
Complex / Layout Change 6+ weeks

Timeline includes design, custom cabinet lead time, permits (if required), construction, and snagging.

Full Timeline Breakdown →
💰
Cost Factors

What Affects the Cost?

  • → Kitchen size — linear metres of cabinetry and floor area
  • → Cabinet material and finish — laminate vs. lacquered vs. solid wood
  • → Worktop material — laminate vs. quartz vs. natural stone
  • → Plumbing changes — cosmetic only vs. full layout redesign
  • → Appliance specification — budget vs. mid-range vs. premium brands
  • → Building access — high-rise apartments vs. villas

We do not publish fixed prices online because no two kitchens are identical. Contact us for an accurate quote specific to your project.

Full Cost Guide →
Get Started

Request a WhatsApp Estimate

Tell us about your kitchen and we'll get back to you on WhatsApp, usually within a few hours.

Compliance

Permits & Approvals
in Dubai

Dubai has specific requirements for kitchen renovation work in residential and commercial properties. Understanding when a permit is needed protects you and your property.

  • ✓ Cosmetic changes (new cabinet doors, worktops) — usually no permit needed
  • ✓ Plumbing rerouting or drainage changes — permit may be required
  • ✓ Gas line changes — must be done by licensed gas contractor
  • ✓ Work in managed buildings — NOC from building management required
Full Permits Guide →

Latest Kitchen Design Trends in Dubai

  • → Handleless cabinets with push-to-open or J-pull profiles
  • → Large-format porcelain slab worktops matching the floor
  • → Two-tone cabinet colour schemes (dark island, light perimeter)
  • → Built-in integrated appliance packages behind matching cabinet doors
  • → Under-cabinet LED lighting for work surface illumination
  • → Open shelving sections combined with closed storage
  • → Smart kitchen appliances with remote control connectivity
See 2026 Trends Guide →
Why Fixer Guy

What Makes Us Different

We focus on honest, complete work rather than lowest-price promises we cannot keep.

🏠

Al Quoz Base

Central Dubai location means faster response across all districts.

🔗

No Unknown Subcontracting

We tell you if and when specialists are brought in — always with your knowledge.

🗄️

Custom Cabinets

Every cabinet is made to measure for your exact kitchen dimensions. No off-the-shelf compromise.

📄

Written Scope Always

Every project starts with a clear written scope so there are no surprises mid-build.

Last reviewed: August 2026  |  Base location: Al Quoz, Dubai  |  Service area: All Dubai districts

Coverage

Kitchen Renovation Across All Dubai

We operate from Al Quoz and cover every major area in Dubai. Select your area for location-specific information.

Related
🪚
Carpentry

Custom joinery and woodwork for kitchens and living spaces.

🔲
Tiling Services

Floor and wall tiling for kitchens and all room types.

🚿
Plumbing

Sink, dishwasher, and pipe installation and repair.

⚡
Electrical

Safe electrical work for kitchen appliances and lighting.

A full kitchen renovation in Dubai typically covers design planning, demolition of old units, custom cabinet manufacturing and installation, worktop fitting, splashback and floor tiling, plumbing adjustments, electrical work (sockets, cooker points, lighting), appliance integration, and finishing. The scope depends on your kitchen size and specification level.
Minor cosmetic changes such as replacing cabinet doors or worktops usually do not require a permit. However, structural changes, plumbing rerouting, or gas line work require the appropriate approvals. Work in managed buildings typically requires an NOC from building management. We advise on this for every project before starting.
A standard kitchen renovation typically takes 3 to 5 weeks. Small galley kitchens can be completed in 2–3 weeks. Large open-plan kitchens with custom cabinets and structural changes may take 5–7 weeks. Custom cabinet manufacturing adds lead time that must be planned in advance.
We serve all major areas of Dubai including Dubai Marina, Jumeirah, Downtown Dubai, Arabian Ranches, Business Bay, Al Quoz, Deira, Bur Dubai, JBR, Palm Jumeirah, JVC, Mirdif, and more. Our base in Al Quoz gives us easy access to all districts.
Yes. We offer a kitchen design service that includes layout planning, cabinet configuration, material selection guidance, and visual planning before any physical work begins. See our kitchen design service page for details.
The quickest way is to use the WhatsApp form on this page. We will ask a few questions about your kitchen size and requirements, then provide an initial estimate. A site visit will then produce a fixed-price quote.
We work with moisture-resistant MDF, engineered wood, and solid wood cabinet carcasses. Finishes include high-gloss lacquer, matte lacquer, vinyl wrap, and real wood veneer. All cabinets are made-to-measure for your kitchen space.
Yes. Appliance integration is part of our kitchen renovation service. We plan electrical circuits, connections, and cabinet openings for built-in ovens, dishwashers, refrigerators, and range hoods during the design stage so everything fits correctly when installed.

Ready to Transform Your Kitchen?

Get a WhatsApp estimate today. No obligation. We respond same day from our Al Quoz base.

Need home services in Dubai? Message us 👋
💬